For the WaterGuard installation process to begin, the concrete near the perimeter walls was removed. Once the concrete was removed, the WaterGuard drain could be set into place. Drainage stone was then laid around the WaterGuard, this increases the effectiveness of the system and allows for maximum water drainage.